Text
1. The Plaintiff (Counterclaim Defendant) is one of the 181 square meters of the land for FF private teaching institutes in Seo-gu, Seo-gu, Seo-gu, Chungcheongnam-si, Cheongju-si
(a) Attached Reference.
Reasons
A principal lawsuit and a counterclaim shall be deemed simultaneously.
1. Basic facts
A. The Defendant completed the registration of transfer of ownership on March 24, 1972 with respect to F School Site F, Seo-gu, Chungcheongnam-gu, Chungcheongnam-gu (hereinafter “Defendant’s land”).
B. On November 19, 1973, Plaintiff A’s net G (hereinafter “the deceased”) purchased from H the I, 238 square meters adjacent to the Defendant’s land (hereinafter “Plaintiff’s land”), and completed the registration of ownership transfer on the 19th day of the same month.
C. On November 11, 1976, the Deceased newly constructed a wooden mentor and a 52.57 square meters away from the ground of the Plaintiff’s land (hereinafter “instant building”), and completed registration of the preservation of ownership thereof. In addition, the Deceased constructed three unauthorized buildings (hereinafter “instant buildings, etc.”) without permission.
On the other hand, the building of this case, etc. is invaded upon the defendant's land, and the actual state of the intrusion is as follows. The attached reference to the defendant's land is marked 10, 39, 32, 22, 23, 4, 5, 11, 21, 20, 31, 19, 18, 35, 17, 17, 36, 16, 15, and 10 are used as the land of this case.
The part (D) of a building connected with each point of 38, 39, 32, 33, 36, 37, 38, and 38 on the ground surface (hereinafter referred to as "building") of 2 identical drawings, 33, 34, 35, 17, 36, and 33 square meters (hereinafter referred to as "building") of (34, 24, 17, 36, and 33 of the above drawings, which connects each point of 30, 31, 31, 19, 18, and 30 square meters of the above ground (hereinafter referred to as "math") to the (ma), which connects each point of 30, 31, 32, 33, 36, 37, and 38; hereinafter referred to as "building") of the above drawings;
E. The Deceased.