logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2014.12.11 2013구합1110
손실보상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. The land survey division prepared in the Japanese occupation period is written by the Gyeonggi-do Department of Land Survey in the Gyeonggi-do, stating that C, having a domicile in Gyeonggi-do Gwangju-gun D Forest 9,078, E Forest 5,287 (hereinafter referred to as “the first previous land” and “the second previous land” and the combined “each previous land of this case”).

B. On September 30, 1959, the previous land of this case was divided into: (1) 6,951 square meters of forest land in Gwangju-gun; (6), G 1,092; and H 1,035 square meters of forest land; (2) F 6,951 square meters of forest was divided into 5,724 square meters of forest; and (3) 5,724 square meters of forest was divided into 1,27 square meters of river; (4) 1,878 square meters of forest land; (6) 3,00 square meters of a river into 9,000 square meters of a river; and (5) 2,000 square meters of a river; and (6) 3,000 square meters of a river into 9,000 square meters of a river; and (7) 4,000 square meters of a river; and (5) 3,000 square meters of a river into 1,000 square meters of a river;

C. Meanwhile, on the other hand, on December 13, 1973, the previous land category of the case No. 2 was changed to a river, and the area unit was converted into a unit of area, and E is 17,478 square meters of a river (hereinafter “the instant land No. 4”), and it was combined with each of the instant lands No. 1, 2, and 3.

Although the time of incorporation of each of the instant lands into a river area for the first time, it cannot be known that the time of incorporation into a river area or the grounds for exclusion from the site or exclusion from the embankment located between highly constructed 1973 and the double-presidential systems constructed 1974, the failure to pay for the river register attached to the Han River Maintenance Master Plan (Cheongcheon, Seo River, Doun River, and Gyeong River) prepared by the Construction Division in 1983.

arrow