(영문) 대구지방법원 안동지원 2018.06.08 2017고정243
업무방해
Text

1. Defendant A shall be punished by a fine of two million won.

Defendant

A fails to pay the above fine.

Reasons

Punishment of the crime

1. Defendants A are the representatives of Co., Ltd. D, and Defendant B is the employees of the above company.

On March 24, 2017, the Defendants entered into a subcontract with H on July 21, 2017 with D Co., Ltd. (hereinafter referred to as “ABD”) with the victim E Co., Ltd. (hereinafter referred to as “ABD”) to enter into a contract for the construction of FBD in the FBD, however, on July 21, 2017, G, the representative of the LBAD, terminated the contract with HWD and agreed to interfere with the construction of the said site.

A. On July 30, 2017, the Defendants committed the crime and around July 30, 2017: (a) around 14:49, at the same construction site on July 30, 2017, the Defendants interfered with the damaged party’s work by preventing the body from spreading to the circulator any longer by pushing ahead the body to a place where the circulating construction is conducted in order to reclaim the cater of waste water.

B. On August 1, 2017, around 16:00 on August 1, 2017, the Defendants directed Defendant A to strike using a scooters to access vehicles to Defendant B at the above construction site. Defendant B, in accordance with his/her instructions, saw the land into the instant construction site, thereby preventing another subcontractor from entering the instant construction site; Defendant B, like the Defendant Company, left the scood in a place where the scood construction is set up to the damaged to reclaim waste water in accordance with Defendant A’s instructions, left the scood, and used the scood truck to load the scood and loaded the scood truck with access vehicles and interfered with the victim’s work of reclaiming waste water in a way that the scoods are parked into the scood.

2. The Defendant is unable to pass through the vehicles, etc. for the installation of gas pipes by setting a dump truck in the space between dump trucks from September 3, 2017 to October 20, 2017.