logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 서산지원 2014.09.12 2014고정205
업무상과실치사등
Text

1. Defendants shall be punished by a fine of KRW 5,000,000.

2. Defendant A and Defendant B did not pay the above fine.

Reasons

Punishment of the crime

Defendant

D Co., Ltd. is a business owner who performs construction works with its head office in Sinjin-si and is a business owner who performs construction works with F in Sin Jin-si from the Jin-si land.

Defendant

A is a manager of the foregoing D Co., Ltd. and a representative of the “G”, who is the above D Co., Ltd., and is a person in charge of safety management of workers belonging to D Co., Ltd. working at the above D Co.

Defendant

B performed the work of transporting waterway pipes to the surface of the above waterway construction site as the operator of the excavation aircraft belonging to "G".

1. At around 10:30 on November 25, 2013, Defendant A and Defendant B instructed Defendant B to transport the waterway to reclaim on the floor of the above waterway construction site (2m, 1.5m, height 1m, weight 1m, 2.5m, Um-shaped) from the cargo vehicle to load the waterway in the surrounding area where the waterway can be buried, and the victim H (24 years old) et al., an employee of the said D Co., Ltd., an employee of the said D Co., Ltd., to transport the waterway and the waterway connected to the water tank and the water pipe in order to assist the transport of the waterway by demolishing the water pipe and the water pipe.

When Defendant A, who is a person in charge of safety management at the site, has a duty of care to conduct work in accordance with the plan, including safety measures to prevent fall, fall, fall, electric level, and narrow landing, in consideration of the results of the investigation, and to conduct work in accordance with the plan, in order to prevent danger to workers, Defendant B, who is a person in charge of safety management at the site, is a heavy object and is in charge of handling heavy objects, has a duty of care to conduct work in accordance with the plan. Defendant B, if Defendant B loads the waterway pipe at the site of the waterway with the waterway pipe connected to the waterway pipe by the victim H, etc. at the time of loading the water pipe on the floor, is in progress.

arrow