Text
Defendant
A A Fines 7,000,000 won, Defendant B’s fine 7,000,000 won, and C Company 2,000,000 won, respectively.
Reasons
Punishment of the crime
Defendant
B From January 1, 2017, a person who works as the site warden of Defendant C Co., Ltd., a electrical construction company, is a person in charge of the safety and health management of “F works in Chungcheongnam-gun, Chungcheongnam-gun,” contracted by the said company. From January 2, 2017, Defendant A works as the server of the said company from January 2, 2017, and is a person who operated and managed the truck truck truck truck truck truck truck truck driver (KS1256G-Ⅱ), and the victim H (S49 years old) is a person who worked as the assistant worker of the said company from January 2, 2017.
1. Defendant B and A business owner shall take measures necessary to prevent any danger caused by machinery, apparatus, and other equipment, and, where they use mobile cranes, they shall comply with the design standards for the relevant mobile cameras in order to prevent any transformation or malfunction, etc. of steel materials, etc. constituting the structural parts of the mobile cameras;
On May 12, 2017, the Defendants: (a) around 14:40, around 14:40, at the first road of the Chungcheong Mayang-gun, and (b) had Gmer carry the utility poles loaded in the location with the victim, using the above-type mobile servers.
At the time, booms were generated in the bend part of the boom which connects the core body and the booms to the above boom, according to the use manual of the booms, at least one year, clers were put into a manufacturing A/S factory for at least once a year, and undergo a cler’s inspection, and every day, check whether the booms occurred in the bend part of the booming part of the booms. However, the defendants are suffering from the above clers at the manufacturing A/S factory and undergo a cler’s inspection, without properly checking whether the booms occurred in the above booms, without properly checking whether the booms occurred in the above booms part of the booming part of the booms connected with the main body of the above clers, so that the booms were damaged as the price for the booming part of the booming part of the above boom, so as not to boom from the below the boom.