Defendant

A Imprisonment for six months, Defendant B, and C, each of six months of imprisonment without prison labor, Defendant D, E, F, and G Co., Ltd.

Reasons

Punishment of the crime

Defendant F Co., Ltd.’s position and position as Defendants F Co., Ltd.: (a) performed construction with a subcontract from G Co., Ltd. for the construction of the S Sectiontop and structure in the construction site in the construction site in the construction site in the F Co., Ltd.; (b) Defendant F Co., Ltd. under the F Co., Ltd.’s jurisdiction; (c) Defendant F Co., Ltd.’s deputy head of the construction site in the construction site in the construction site in the construction site in the construction site in the construction site in the construction site; (d) Defendant C Co., Ltd., which supplied the PC PC hub to F Co., Ltd. in relation to the above soil and structure construction; (e) Defendant G Co., Ltd., established for the construction project, etc. in the construction site in the Han-gu U.S. in the construction site in the construction site in the construction site in the construction site in the construction site in the construction site, and (e) Defendant D Co., Ltd.’s overall safety management and supervision of workers;

1. Among the construction sections of Defendant A, Defendant B, Defendant C, Defendant D, and Defendant E, the cross-section tunnel was designed to be installed as the PC slves (Prete) type due to the difficulty in quality control of the slive concrete at the beginning, but the cross-section tunnel was designed to be installed as the PC slves (Prete) type due to the difficulty in managing the quality of the slves.

Accordingly, the PC slves to be installed in the crossing tunnels were planned to be constructed in order of the installation of slve diskettes and slves, material entry, system building and PC slves installation, PC slves assembly and PC slves assembly, hosting, quantitativeing, system dismantling, and field rearrangement, and up to December 18, 2015 PC slves.