(영문) 서울중앙지방법원 2015.02.13 2014고단8165
사기
Text

A defendant shall be punished by imprisonment for not less than one year and six months.

However, the execution of the above punishment shall be suspended for two years from the date this judgment became final and conclusive.

Reasons

Punishment of the crime

From the end of July 2012 to August 31, 2013, the Defendant, as the head of the construction team of H Co., Ltd. (hereinafter referred to as “H”) with the 701st floor of the 7th floor of H Co., Ltd. (hereinafter referred to as “H”) of the Y Co., Ltd. (hereinafter referred to as “Dong Hongcheon-Yyang-Yyang-Yyang-Yyang-Yyang-Yyang-Yyang (hereinafter referred to as “Dong Hongcheon-yang-Yyang-Yyang-yang”) of the Hai-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-Yan-gu Office of the H’s site, has overall control over the overall work on the construction site.

On December 29, 2008, the Hanjin Heavy Industries Co., Ltd. (hereinafter referred to as the "Kjin Heavy Industries") entered into a contract with the Korea Highway Corporation for the above Hongcheon-Yyang Igyang Construction. On June 15, 2012, H entered into a subcontract with the above Hanjin Heavy Industries for the blasting, excavation, and construction of the J Tunnels of the above Hongcheon-Yyang Igyang Igle J tunnel construction.

On December 2, 2012, the Defendant filed a claim for payment for the completion of the construction of the Hank-W with the Korea Highway Corporation through the Hanjin Heavy Industries, as if the Defendant completed 3,646 parts of the design quantity according to the design plan, even though he completed the construction of the Hank-yang ImV at the site office of the Hancheon-yang Imnm-K located in the Hanwon K, and completed the construction of the tunnel on the wall of the tunnel, and completed the Hank-V used as the reinforced materials as the reinforced materials of the tunnel.

However, the facts do not construct only 1,870 mV and do not arbitrarily construct the remaining 1,776 mV, unlike the design quantity.

On December 31, 2012, the Defendant received KRW 51,817,00 from the Korea Highway Corporation under the pretext of progress payment for the construction of sV.

In addition, the Defendant completely executed 20,072 p.m. 20,072, which is the initial design quantity, at a total of seven times as indicated in the attached list of crimes, from the above date to December 30, 2013.