logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2015.02.10 2014고단7319
사기
Text

A defendant shall be punished by imprisonment for one year.

except that the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

From October 2012 to July 2013, the Defendant: (a) entered into a contract with the Korea Highway Corporation with the victim on July 30, 2010 for the construction of the 5 construction sections of the project site located in Gangnam-gu Seoul Metropolitan Government (hereinafter “D”); (b) the Defendant entered into a subcontract for the construction of the 5 construction sections of the tunnel construction project, blasting, excavation, and sponsck-V construction between the project implementer and the Korea Highway Corporation on March 31, 2011. (c) D entered into a subcontract for the construction of the 5 construction sections of the tunnel construction project, blasting, excavation, and construction between the project implementer and the project implementer on March 31, 2011.

The Defendant constructed a tunnel 1 tunnel composed of two tunnels, including 2,63 meters in length and 2,563 meters in length, with respect to resident-permanent 5 sections for the construction of a tunnel. While the deficit of approximately KRW 1 billion in the construction site due to the delay in construction, etc. cumulative construction of a tunnel or base theft used as reinforced materials for the reinforcement of a tunnel, etc. while a structure is built by putting it into the base and breaking it into the ground so as to prevent the fall of the surface rock roof or its use (or the Korea Resources Corporation on December 2, 2010), as one of the reinforced materials for the ground of a tunnel, it was difficult to manage the materials carried in the site and supervise the construction of the tunnel in the process of the excavation, and to improve the construction of the tunnel without the surface rock in the course of construction of the Korea Expressway Corporation as designed to improve the construction of the tunnel by making it difficult for the victim to rapidly perform construction work and supervision over the construction site.

The Defendant North Korea around November 2012.

arrow