(영문) 서울중앙지방법원 2015.01.16 2014고합1065
특정경제범죄가중처벌등에관한법률위반(사기)
Text

Defendant

A Imprisonment of one year and six months, Defendant B shall be punished by a fine of seven million won, and Defendant C shall be punished by a fine of three million won.

Reasons

Punishment of the crime

1. From January 7, 2013 to March 2014, Defendant A: (a) the head of the site office of the construction site of the Dong Branch Construction Co., Ltd. (hereinafter referred to as “Dong Branch Construction”) located in the Dong Branch Construction Co., Ltd., Ltd. (hereinafter referred to as “Dong Branch Construction”) of Yongsan-gu, Yongsan-gu, Seoul (hereinafter referred to as “Dong Branch Construction”) with the National Expressways No. 60, Hongcheon-Yyangyang-Yyang-Yyang-yang (hereinafter referred to as “Dong Hongcheon-Yyangyang G G Section”) to approve the detailed statement of flag, work log, etc.; and (b) the overall duties

On the other hand, on April 28, 2009, the same sub-construction entered into a contract with the Korea Highway Corporation for Victims on April 28, 2009 for the tunnel construction of the same Hongcheon-Yyang G Section.

The Defendant, in the course of constructing a H tunnel with respect to the construction of the Dong Hongcheon-Yyang G Section, intended to obtain money by falsely claiming progress payment to the Korea Highway Corporation as if he/she completed construction and completed construction works with a difficulty in managing and supervising the site supervisor, etc. of the Korea Highway Corporation in order to prevent the fall of surface rock in the structure that is built by cutting down the cryp of the cryp in the cryp in the construction of the tunnel, the cryp of the cryp, etc. in the construction of the tunnel or the cryp of the cryp of the cryp of the cryp of the cryp of the cryp of the cryp, etc.

around May 2013, the Defendant uniforms the address of the Dong Hongcheon-Yyang Galyang Gging site office, which is indicated in the facts charged of the charges charged of Gangwon-do, into “Gangwon Man- I” which is the road name address.

Despite the construction of a low sleV at the Doncheon-Yyang G-Yak site office located in the Donyang G Section, 3,282 sleV was completely constructed according to the design quantity according to the design plan, the injured party requested the Korea Highway Corporation to pay for the completed portion of the sleV.

However, the facts are different from the design quantity, but only 90 mVs are constructed and 2,382 mVs are arbitrarily installed.