logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 2019.10.04 2019고단1470
절도
Text

A defendant shall be punished by imprisonment for one year.

The seized evidence 1 (Seoul District Prosecutors' Office 2019No. 729) shall be from the defendant.

Reasons

Punishment of the crime

On March 7, 2019, from around 14:20 to around 15:35 of the same day, the Defendant stolen approximately 150 m3 of the steel de-grafom ( approximately 80 cm, length 20 m20 m2) of the market value of the above victim’s ownership, which was located there, using a gap in the surveillance of the victim C from around 14:20 to around 15:35 of the same day.

At around 17:30 on February 4, 2019, the Defendant: (a) stolen the volume of 1,000 km in the market value of the victim F Co., Ltd. in the victim F Co., Ltd. at the road construction site in Sejong E, by loading it to D Poter cargo vehicles at KRW 7.60,00 km.

"2019 Highest 2086"

1. From around 17:40 on March 8, 2019 to 18:30 on the same day, the Defendant: (a) committed a theft by carrying 6 string 5 million won in total at the victim I’s market price owned by the Defendant at the top of H, a company located in Chungcheongnam-gun G, Chungcheongnam-gun G; and (b) 60 scrap string 50,000 won in total at the victim J’s market price, and 500,000 won in total at the victim J’s market price.

2. From around 10:20 on March 10, 2019 to 10:48, the Defendant: (a) stolen the market value of the said victim’s possession around the Daejeon Dong-gu K and the materials storage of the victim M Co., Ltd., Ltd., the Defendant loaded 50,000 won on the D Poter freight vehicles in the aggregate amounting to KRW 1.5 million.

"2019 Highest 3031"

1. On March 31, 2019, around 21:20, the Defendant was at the construction site near Daejeon-dong, Daejeon-gu N, Daejeon-gu, and caused a theft of the Defendant’s 320,000 won of steel products (H beamline, 1 type one river) at the market price he stored in order to perform the work of the Victim P by using any cres outside the surrounding area.

2. On April 20, 2019, the Defendant came to the construction site of a new building located in Q Q in the city of 00:19 on April 20, 2019, and brought about about 1.2 million won in the market price, which was accumulated to perform the victim R construction by using any cres in the surrounding areas, and brought about about 1.50 m. (19m in thickness x 3m in length) in loading cargo loaded.

arrow