logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2020.04.02 2019고단5753
절도등
Text

A defendant shall be punished by imprisonment for not more than ten months.

Reasons

Punishment of the crime

1. Larceny;

A. On February 9, 2019, around 00:53, the Defendant cut off CCTV wire on the market price, which was installed at the entrance of the victim C and cut off for multi-purpose purpose.

B. Around March 28, 2019, the Defendant: (a) was at the construction site D at Sung-si; (b) the victim E-owned market value of KRW 10,000,000; and (c) stolen the victim’s 10,000,000,000,000,000,000 won; and (d) the Defendant

C. On April 9, 2019, the Defendant: (a) was at the construction site above; (b) the victim E-owned cable 1 rolls at a level equivalent to KRW 3 million in the market value; and (c) was stolen with a lux line equivalent to KRW 100,000 in the market value.

On April 26, 2019, between around 17:00 and April 27, 2019, the Defendant: (a) committed theft with electric wires and tamper lines equivalent to KRW 700,000,000, and cable lines equivalent to the market value of the victim E, installed therein, were stolen.

E. From around 19:00 on April 30, 2019 to May 08:40, 2019, the Defendant: (a) cut the locks, which are the entrance rectification devices, and opened the door content, into the entrance, with the cutting machine, and 26 illness, such as Dozackers, which is the victim C, in an amount of KRW 6.50,000,000; (b) returned 110,000,000 in the market price; (c) red ginseng office, the market price of which is equivalent to KRW 80,000,000,000 in the market price of KRW 1kg; (d) 50,000,000 in the market price of KRW 1,50,00,00 in the market price; and (e) 1.70,000,000 won in the market price of KRW 1.74,00,00.

F. From around 17:00 on May 11, 201 to May 12, 2019, the Defendant came to be at the same construction site as Paragraph 1(b) between around 17:00 and around 07:00 on May 12, 2019, at the same time as Paragraph 1(b). The Defendant is from the electric wires connected from the power generator equivalent to KRW 300,00,00 at the victim E-owned price to the hydrotension, five meters from the electric wires connected

arrow