(영문) 서울행정법원 2018.05.18 2017구합59215
입찰참가자격제한처분취소
Text

1. The Defendant’s participation in bidding for six months from March 17, 2017 to September 16, 2017 against the Plaintiff on March 9, 2017.

Reasons

1. Circumstances leading up to the disposition: The name and quantity of the Jeju Special Self-Governing Province Water Resources Headquarters: One type contract amount for an automatic malodor dilution device: 364,800,000 won: January 13, 2016;

On June 2015, the Plaintiff refers to the pipes (air or gas pipes and ventilation pipes) from the outside of the instant procurement commodities, in which the public water supply materials (hereinafter referred to as “public water supply materials for improving sewage treatment facilities”) consisting of air or gas pipes for improving sewage treatment facilities.

As seen below, it constitutes the entire virtue of the instant case

) The air flowing through the rapid air pande through the rapid air pande is a facility which re-discharges the air through the air pande through the air pande (e.g., the air pande) after having contacted the air pande (e.g., the indoor pande) and removing the indoor pandem, and then re-discharges the air through the air pande (e.g., the air pande) through the air pande (e., the air pande) through the air pande (e.g., the pande).

Accordingly, on June 17, 2015, the Plaintiff entered into a contract with the following terms.

Since then, the delivery deadline was extended to August 2, 2016.

(hereinafter referred to as the “instant contract”). B.

On December 17, 2015 and January 13, 2016, the East Technology Corporation, a supervisory group of the instant construction project (hereinafter referred to as the “Dongm Technology Corporation”), sent to the Plaintiff an official letter stating, “On two occasions, the installation of the so-called so-called “Seoul Technology Corporation” (hereinafter referred to as the “Dongm Technology Corporation”) shall be included in the scope of the Plaintiff’s construction work in the so-called “the so-called “the so-called the so-called “Seoul Technology Corporation”) with air tamp equipment and outside.”

Accordingly, on December 22, 2015, the Plaintiff’s Water Resources Headquarters of Jeju Special Self-Governing Province (from July 2016, Jeju Special Self-Governing Province Water and Wastewater Headquarters), and on January 25, 2016, the virtue that the Plaintiff is required to install under each of the instant contracts is linked to the composition of the spatial sloping equipment.