(영문) 서울남부지방법원 2013.09.23 2013고정689
수질및수생태계보전에관한법률위반
Text

The defendant is not guilty. The summary of the judgment against the defendant shall be published.

Reasons

1. The Defendant is a person who operates a manufacturing company in the name of Guro-gu Seoul Metropolitan Government “E”.

A person who intends to install a wastewater discharge facility shall file a report on the installation of the wastewater discharge facility with the head of the competent Gu.

Nevertheless, from October 16, 2007 to August 24, 2012, the Defendant did not install wastewater discharge facilities at the competent Gu office. From the above “E” place of business without reporting the installation of wastewater discharge facilities. During the manufacturing process of single dysium 6, etc., water-quality pollutants, BOD (biological oxygen demand) 9,00.0 g/L base values (120 g/L below) 75 times, COD (chemical oxygen demand) 2,493.5 g/L base values (130 g/L) 19.2 times of waste extraction (130 g/L) 484.0 g/ 484 g (120 gh/L) g, total quantity exceeding 36 g/ 84 g (36 mm of waste water) / 60 g, total quantity exceeding 63 gg g. respectively.

2. Determination

A. According to the legal provisions and the issues of this case (1) pursuant to Article 33(1) of the Water Quality and Aquatic Ecosystem Conservation Act (hereinafter “Water Quality Conservation Act”), a person who intends to install a facility discharging water pollutants shall obtain permission from the Minister of Environment or file a report with the Minister of Environment, and a person who intends to install a facility discharging water pollutants shall file a report with the Minister of Environment. The Enforcement Rule of the Water Quality Conservation Act [Attachment 4] [Attachment 4] [Attachment

2) According to paragraph (2), a facility that discharges wastewater that does not include specific substances harmful to water quality or heavy metal shall be a facility with a maximum volume of wastewater exceeding 0.1 cubic meters per day, which requires permission or a report as above, but according to Section 1.A.2(a) of the above attached Table, the wastewater whose maximum volume of wastewater per day does not exceed 20 cubic meters and which does not include mineral oil.