logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울남부지방법원 2013.09.23 2013고정702
수질및수생태계보전에관한법률위반
Text

The defendant is not guilty. The summary of the judgment against the defendant shall be published.

Reasons

1. The Defendant is a person who operates a place of business that manufactures food with the trade name “E” in Guro-gu Seoul Metropolitan Government.

A person who intends to install wastewater discharge facilities shall file a report on the installation of wastewater discharge facilities in the competent Gu office in accordance with the relevant Acts and subordinate statutes.

Nevertheless, from November 4, 2008 to August 31, 2012, the Defendant did not report wastewater discharge facilities to the competent Gu office. From “E” place of business with a size of 164.9 square meters, two 6.25 square meters per food manufacturing-related facilities, one washing machine, one packing machine, etc., and produced products using water sprinking and sprinking down the salt on salt, while producing products using BaD (biological oxygen demand) with a total of 1,734 g/L (120 g/L) 14.4 times every day, COD (chemical oxygen demand) with a total of 1,236.8 g/L 200 g (130 g/L 20 g) with a total of 1,734 g/ 20 g (120 g/ 7 g) with a total of 1,236 g g/ 20 g (130 g g) without permission.20 g).

2. Determination

A. According to the legal provisions and the issues of this case (1) pursuant to Article 33(1) of the Water Quality and Aquatic Ecosystem Conservation Act (hereinafter “Water Quality Conservation Act”), a person who intends to install a facility discharging water pollutants shall obtain permission from the Minister of Environment or file a report with the Minister of Environment, and a person who intends to install a facility discharging water pollutants shall file a report with the Minister of Environment. The Enforcement Rule of the Water Quality Conservation Act [Attachment 4] [Attachment 4] [Attachment

According to paragraph 2, a facility that discharges wastewater that does not include specific substances harmful to water quality or heavy metal shall have a maximum volume of wastewater exceeding 0.1 cubic meters per day shall be deemed a wastewater discharge facility requiring permission or reporting as above, but attached Table 1.

arrow