logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울동부지방법원 2016.08.11 2015가단30979
대여금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. C Co., Ltd. (hereinafter “C”) prepared each of the following loan certificates (hereinafter “each of the instant loan certificates”) and delivered them to the Plaintiff:

(1) Persons as of August 10, 2008: 30,000 won: 30,000 won for the construction of new lots outside Dong-si and two parcels; 10,000 won for the construction of new factories; 10,000 won for the due date; 2. October 10, 2008, for the construction of new construction sites for Daejeon Etel; 10,000,000 won for the construction of new factories; 10,000 won for the construction of new factories; 200,000 won for office expenses; 3.27, September 27, 2008: the due date for the repayment; 10,000 won for the construction of new factories; 4.50,000,000 won for the construction of new factories; 10,000 won for the construction of new factories; 5.0,000,000 won for the construction of new factories, 200,000.

The Defendant signed each of the above lending certificates as follows:

(that is, due to the nature of the signature, the signature of all borrowed certificates is not entirely identical, but its location, etc. shall be specified). HB C

C. On August 18, 2008, the Plaintiff paid KRW 30,000,00 to H and Defendant B with respect to the tea evidence. ② On September 24, 2008, the Plaintiff remitted KRW 20,000 to the account of the employee I of C on September 24, 2008, ④ on December 1, 2008, remitted KRW 50,000,000 to the account of the employee J on December 1, 2008, and ⑤ on the tea evidence, remitted KRW 17,00,000 to K designated by H on January 15, 200, and separately remitted KRW 3,00,000 to the on-site account of C on September 2, 2008.

(no loan certificate is available) d.

around that time, the Plaintiff is an auditor of M Co., Ltd. (hereinafter referred to as “M”)’s registration and had worked as a representative director externally. The following construction was contracted by C at the time of the preparation of each of the instant loan certificates and the transfer of each of the above loans.

(1) On October 6, 2008 (contractor M) 2.

arrow