(영문) 인천지방법원 2014.07.16 2013가단221403
건물명도
Text

1. The Defendants indicated in the separate sheet (A) of the real estate indicated in the separate sheet to the Plaintiff, as well as reinforced concrete.

Reasons

1. Basic facts

A. 1) Defendant B Co., Ltd. (hereinafter “Defendant Co., Ltd.”) is limited to the relationship between the rights of the instant land, factory building, and each of the instant buildings.

) This case’s factory site in Jung-gu Incheon Metropolitan Government, which completed the registration of ownership transfer on July 25, 2001 (hereinafter “instant factory site”) is 1,190 square meters.

(2) On the ground, the Defendant Company’s 130.50 square meters and 130.50 square meters and 130.50 square meters and 130.50 square meters and 2 stories of the 1st floor of the 1st floor of reinforced concrete, light steel framed, which completed the registration of ownership transfer

In addition, (B) In addition, the part of the attached drawing indication (B) section 158 square meters, the panel of the panel of the board and the tent roof, and 158 square meters, (c) part 27 square meters, (d) part 120 square meters, the multi-story (multi-use room) part 120 square meters, the multi-story of the steel pipe in the pipe pipe in the part (ma), 18 square meters, the part 18 square meters, the part 5.2 square meters, the part 5.2 square meters, the part 5.2 square meters, the part 5.2 square meters, the part 63 square meters, the part 63 square meters, the part 63 square meters, the part 60 square meters, and the part 70 square meters, each of the non-production buildings (hereinafter referred to as the "non-Presentation building in this case").

(2) As to the land and factory buildings of this case, the Defendant Company newly constructed the buildings other than the presentation of this case as indicated in the attached drawing for the food business operated by the Defendant Company. 2) On November 17, 2003, the establishment registration of the mortgage with respect to the land and factory buildings of this case with respect to the Geumsung Mutual Savings Bank (hereinafter referred to as the “Seoul Mutual Savings Bank”), the establishment registration of the mortgage with respect to the land and factory buildings of this case with the maximum debt amount of 140 million won on November 17, 2003, and the debtor C, the debtor C, the mortgagee and the mortgagee Mutual Savings Bank of Korea on February 4, 2004, the establishment registration of the mortgage with respect to the establishment of the mortgage with respect to the debtor C, the debtor C, and the mortgagee Mutual Savings Bank of Korea on April 6, 2005, and the establishment registration of the mortgage with respect to the establishment of the mortgage with respect to the debtor C and the mortgagee Mutual Savings Bank of Korea on April 6,

B. On October 17, 201, a gold Savings Bank Co., Ltd. (hereinafter referred to as the “Voluntary Auction Procedure”) was to enforce the said right to collateral security.