(영문) 서울동부지방법원 2014.08.06 2013가단30241
구조물철거 등
Text

1. The defendant,

A. The plaintiffs indicate 1, 2, and 2 of the attached drawings among the structures of the Seongdong-gu Seoul Metropolitan Government Ground Fire Group of 1051m2.

Reasons

1. Basic facts

A. The Plaintiff A completed the registration of ownership transfer based on inheritance on December 29, 1999 with respect to 1/2 shares of each of the 1/2 shares of Seongdong-gu Seoul Seongdong-gu 1051 square meters (hereinafter “instant land”). The Plaintiff B completed the registration of ownership transfer based on donation on December 29, 2005.

B. On March 13, 1997, Nonparty Co., Ltd. completed the registration of ownership transfer with respect to F. F. 532.3 square meters (hereinafter “the adjoining land of this case”). The registration of ownership transfer with respect to the adjoining land of this case was completed on the neighboring land of this case, newly constructed reinforced concrete building, Pyeongtaekbrobro 7 floor business facilities and neighborhood living facilities (hereinafter “the building of this case”) and completed the registration of ownership preservation on February 27, 1999. The registration of ownership transfer was completed on January 7, 2008 by dividing the company and establishing the Defendant Company. On January 16, 2008, the registration of ownership transfer was completed in the name of the Defendant Company on the grounds of corporate division.

C. When constructing the instant building, E Co., Ltd. installed and owned a fireproof structure, container structure, and drainage hole structure over the instant land and neighboring land. Of the fireproof structure, the parts (B) connected in sequence 1, 2, 20, 19, 19, and 1 of the attached Form No. 1, 20, 21, 18, and 19 are installed on the instant land, which connects each point of (c) section 2.3 square meters of the attached Form No. 19, 20, 21, 18, and 19 of the attached Form No. 19, 20, 21, 16, 17, and 18 of the attached Form No. 18 among the drainage structure.

Among the instant land, the rent price of the sum of 6.3 square meters in the sum of (b), (c), and (d) part of the attached drawing is as follows:

The monthly rent for the period from June 14, 200 to December 31, 2003 to December 11, 2003 to December 31, 2003; 11,430,000 from January 1, 2004 to December 31, 31, 2004 to December 1, 31, 2004; 19,000 to December 31, 31, 2005 to December 31, 31, 2000; 131,570, 131,000 to December 31, 2000; 1,004 to December 31, 200 to December 31, 200; 1, 2006; 1,000,005 to December 58, 200 to 18, 2007;