Text
1. The Plaintiff:
A. The Defendants are each indicated in the separate sheet No. 1, 2, 3, 4, and 1, among the 16,249 square meters of the C river in Chungcheongnam-si.
Reasons
Basic Facts
- On June 30, 2016, the Plaintiff obtained permission for use under Article 30 of the State Property Act and Article 22(3) of the National Sports Promotion Act from the Ministry of Culture, Sports and Tourism, which is the management authority, for the land of this case, the land of this case (hereinafter “instant land”), which is a State-owned land, from the Ministry of Culture, Sports and Tourism, and was also entrusted with the management authority, and managed the land of 1,134,792 square meters for the land of this case in the Hanam-si, which includes the said river site.
- The Defendants, as couple’s and couple, installed a 6-meter ground breath of the area on the ground of this case, which connects each point of 1,2,3,4, and 1 in sequence on the land of this case with the indication of the attached drawing on the land of this case, and the indication 5,6,7,8, and5 of the same drawing, in order to connect each point of (vii) 28 m2,000 square meters in the ship, and the indication 9,10,11,12, and 9 of the same drawing, in order to connect each point of (O) 42 m2,000 square meters in the ship, and of (13,14,15,16, 13 of the same drawing, and 4 m2,000 square meters in order to connect each point of 44 m2,000 square meters in the ship’s land of this case (hereinafter collectively referred to as “the structure of this case”). The parts of this case, among the same land of this case, shall be occupied 17, 17, 8, 29, 27, 2197,26 24,27
[Grounds for recognition] Fact-finding, Gap's statements, images, and the whole purport of the arguments, based on the above facts, the plaintiff can exercise in subrogation the right to use and manage the land of this case against the third party in order to preserve the right to use and manage the land of this case. The plaintiff exercised this right by the lawsuit of this case. The defendants removed the structure of this case installed without permission on the ground of the land of this case without permission, and have the duty to deliver the land possessed by the defendants among the land of this case.
As to this, the defendant.