logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울동부지방법원 2016.02.05 2015가단45964
비닐하우스철거 및 토지인도
Text

1. The defendant shall be the plaintiff.

(a) The attached drawings among the area of 922 square meters and 1,015 square meters before Gangdong-gu Seoul Metropolitan Government prior to D, (1), (2), (3), and (4).

Reasons

According to the judgment on the cause of the claim Gap 1-7 (including each number), the plaintiff completed the registration of ownership transfer on March 23, 1985 with respect to the land of 922 square meters and 1,015 square meters prior to D, Gangdong-gu Seoul, Gangdong-gu, Seoul (hereinafter referred to as "the land of this case"). The current status of the land of this case is as shown in the attached Form 2 and the attached Form 2 (the attached Form 2 drawings are outlined, and the attached Form 2 are detailed). The defendant is recognized as having the fact that the land of this case is located in each of the above part of the attached Form 1, 2, 3, 4, 5, 6, and 530 square meters on the ground of approximately 530 square meters in the ship connected each point, and the attached Form 2, and the attached Form 1, 2,

Therefore, the Defendant, exercising the right to demand the Plaintiff to refrain from interfering with the instant land based on ownership, shall remove each of the following drawings (1), (2), (3), (4), (5), (1), (2), (2), 2, 2, 2, 2, 1, 3, 2, 3, 1, 2, 3, 1, 3, 1, 1, 66, 1, 1, 1, 1, 1, 1, 1, 1, 60, 1, 60, 1, 60, 1, 1, 60, 1, 1, 2,3, 4, 5, 50, 530, 530, 530, 530, 1,0000, 5,0000, 5,0000,000,000,000,000,00,000).

arrow