logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2019.08.20 2018가단5023660
점포명도 등
Text

1. The Plaintiff:

A. Defendant A Co., Ltd. shall display 11, 4, 3, 2, and 1 of the attached drawings among the buildings listed in the attached list.

Reasons

1. Determination as to the claim against Defendant A corporation

A. On January 2012, Seoul Matro: (a) A building listed in the attached list in Jongno-gu Seoul Metropolitan Government H (hereinafter “instant commercial building”) around January 201;

Of the attached drawings, the part C of subparagraph C connected in sequence 1, 4, 3, 2, and 1 of the attached drawings is 23.14 square meters (hereinafter referred to as “C”) in the ship connected in sequence.

(D) Of the buildings listed in the separate sheet, the part No. 4, 5, 6, 3, and 4 of the attached sheet connected in order to each point of the attached sheet No. 16.15 square meters (hereinafter referred to as “D”).

(A) Of the buildings listed in the separate sheet, the part I in the attached Form I and 21.82 square meters (hereinafter “I”) connected in order to each point of the attached sheet Nos. 5, 6, 7, and 8.

(E) Of the buildings listed in the separate sheet, the part E in the attached Form No. 19.14 square meters (hereinafter “E”) connected in order to each point of the attached sheet No. 9,12,11,10,9

() Of the buildings listed in the attached list, the part F of the attached Form No. 12, 13, 14, 11, and 12 in line with each point are 29.62 square meters in line with each point in order. (hereinafter “F”).

() Of the buildings listed in the separate sheet, the part G heading 29.40 square meters (hereinafter “G heading”) in the ship connecting each point of the separate sheet Nos. 15, 18, 17, 16, and 15 in sequence among the buildings listed in the separate sheet;

The parts of the above C, D, I, E, F, and G are collectively referred to as “each of the instant stores.”

Defendant A Co., Ltd (hereinafter “Defendant A”)

B) The following terms and conditions are as follows (hereinafter “instant lease agreement”).

The subject matter of a lease contract was concluded. The contract amount: Won 2,21,103,940 square meters: Won 2,221,103,940 rental deposit: Won 666,331,182: Won 22,196, and the contract term: Won 22,196: Won 19: Won 30 January 30, 2012 or June 18, 2012: 37,018, 39, and 24, ① Defendant A compensate for damages, etc. due to the defect of the facilities that occurred during the period of the construction and operation of the land, or due to the fault or negligence of Defendant A, due to the violation of the responsibilities and obligations stipulated in this contract, the violation of the statutes, the act of care or negligence.

arrow