logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2016.04.20 2015가단59661
건물명도 등
Text

1. Defendant B shall take the following order in order: (a) the number of points indicated in the attached Form No. 2, 3, 10, 11, and 2 on the 1st floor of the building listed in the attached Table No. 1.

Reasons

1. Indication of claim;

A. The Plaintiff and E share 1/2 shares of the real estate listed in the separate sheet.

B. On October 6, 2014, the Plaintiff entered into a lease agreement with Defendant B and the end of October 5, 2015, setting forth a deposit of KRW 3 million with respect to the portion (B) 27.26 square meters in sequence of each point on the 1st floor of the building indicated in the annexed sheet with Defendant B, as indicated in the annexed sheet, from October 6, 2014 to October 5, 2015.

C. On January 15, 2013, the Plaintiff entered into a lease agreement with Defendant C and the end date from April 30, 2013 to April 30, 2014, with regard to the portion of 27.26 square meters in the ship (ma), which connects each point of 8, 7, 15, 14, and 8 of the attached drawings, in turn, among the 1st floor of the building listed in the attached Table with Defendant C, by setting a deposit of 3,00,000 won, monthly rent, and period from April 30, 2013.

On the other hand, Defendant D made a move-in report to the above address and occupied the above building.

Defendant B did not pay rent from February 2015, and Defendant C did not pay rent from October 2014.

E. The Plaintiff terminated the instant lease on the ground of the delinquency in rent between Defendant B and C.

F. Therefore, Defendant B shall deliver to the Plaintiff a portion of 27.26 square meters in the ship (B) connected in order to each point of 2,3,10,11, and 2 of the attached Form No. 1 floor of the building indicated in the attached Table No. 1 to the Plaintiff. From February 7, 2015 to the delivery of the building above, Defendant C and D shall pay an amount equivalent to KRW 175,00 per month. Defendant C and D shall deliver a portion of 27.26 square meters in the ship (e) connected in order to each point of 8,7,15,14, and 8 of the attached Form No. 1 floor of the building listed in the attached Table No. 1 to the delivery of the building above from October 1, 2014 to the delivery of the building above, and Defendant C shall pay an amount equivalent to KRW 190,00 per month.

2. Judgment made in the constructive confession (Articles 208 (3) 2 and 150 (3) of the Civil Procedure Act);

arrow