(영문) 서울중앙지방법원 2017.09.08 2015가합563916
손해배상(건)
Text

1. As to KRW 1,868,109,156 and KRW 201,00,000 among the Plaintiff, Defendant B Co., Ltd. shall start from October 23, 2015, and 1.

Reasons

1. Determination as to the claim against the defendant B

(a) The indication of the claim (attached Form 1) is the part falling under Defendant B among the description of the cause of the claim.

(b) Articles 208 (3) 2 and 150 (3) of the Civil Procedure Act of the applicable provisions of Acts;

2. Determination on the claim against Defendant Construction Mutual Aid Association

A. Basic facts 1) The Plaintiff is an autonomous management body comprised of occupants for the management of 1105 households, including 3 apartment-type factory buildings, commercial buildings, dormitories, etc. in Kimpo-si, Kimpo-si (E) (G) 323 households (G) 536 households (G) 246 households; hereinafter referred to as “instant building”).

B) Defendant B is the seller of the instant building, and the Intervenor C Co., Ltd. (hereinafter “Defendant 2 Intervenor”) of the Defendant Construction Mutual Aid Association.

(2) As to the instant building, the Defendant Construction Mutual Aid Association entered into a contract for the repair of defects with Defendant 2’s Intervenors for the construction of the said building. (2) The Defendant Construction Mutual Aid Association entered into a contract for the repair of defects with Defendant 2’s Intervenors for the construction of the said building as indicated below (hereinafter “instant contract for the repair of defects”).

Since then, the guarantee creditor of the contract of this case was changed to the plaintiff.

The warranty period of the name of construction type No. H Ha (won), another day, metal, tailhead, hold, glass, painting, painting, furniture, and other construction (1 year from March 11, 2009 to October 10, 201) 1,343,129,825 I Civil Works, landscaping, and installation works from March 11, 2009 to March 10, 201 (2 years) 516,924,127 JJ 127, 127, 13.3.9 to March 11, 201, 209 to March 11, 201, 201; 3.4.9 to March 10, 201; 17.3.9 to March 10, 2011; 17.3.4 to 3.6.4 to 13.6.7.28, 2013;