(영문) 서울동부지방법원 2014.04.29 2013가합1240
채무부존재확인
Text

1. Attached Form to the plaintiff's defendant

1. The obligations indicated in the list shall be KRW 46,929,130 and the obligations related thereto from January 24, 2013 to January 2014.

Reasons

1. Basic facts

A. On April 21, 2009, the Defendant ordered the construction of a new street parking lot in the Dong-dong Street Park (hereinafter “instant construction”) and selected the Plaintiff as a successful bidder. On April 21, 2009, the Defendant entered into a contract between the Plaintiff and the Plaintiff regarding the construction of a new street parking lot in the Dong-dong Street Park (hereinafter “instant contract”).

B. Under the instant contract, the remaining soil disposal items at the construction site of this case were KRW 255,505,937,00,000,000,000,000 from the 44,880.7,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,00,000,00

C. The Plaintiff completed the instant construction around October 2010, and completed the construction, and KRW 15,936 per cubic cubic meter (based on the successful bid rate of KRW 85.538%) at the cost of remaining soil treatment (based on the successful bid rate of KRW 85.538%) (i.e., KRW 4,367 for direct labor costs of KRW 4,357 for direct labor costs of KRW 3,353), the amount calculated by multiplying 49,317 cubic meters by the volume of KRW 785,915,712 for indirect labor costs of KRW 23,259,672 for indirect labor

2. It is indicated that the total amount of 1,032,90,414 won is required, including other expenses, general management expenses, profits, and value-added taxes, such as the statement of "calculated expenses for treatment of residues" in 15 tons, and the internal horizontal raining items are 4,852 won per kilogram, multiplied by the quantity size of 8,852 square meters (i.e., the direct labor cost of 825 won for material costs). The internal raining items are 42,941,052 won, multiplied by the quantity size of 8,852 square meters.

4. It is stated that the sum of other expenses, general administration expenses, profits, and value-added taxes, such as the original design column of the “original cost account statement” is required in KRW 63,085,356.

The defendant shall conduct remaining soil treatment work with 24 tons of truck, not 15 tons of truck, and the defendant shall pay 87,680,000 won for the expenses incurred in performing remaining soil treatment work with 24 tons of truck.