logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2013.12.13 2013나2002588
구상금
Text

1. The following portion of the judgment of the court of first instance against Defendant Incheon Daesung Co., Ltd.

Reasons

The plaintiff is a person who runs a mutual aid business established pursuant to the Passenger Transport Service Act, and has entered into a mutual aid agreement with respect to A high speed bus A (hereinafter referred to as “instant bus”) between the Mapo-gu and the corporation.

Defendant Samsung M&T Co., Ltd. (hereinafter “Defendant Samsung M&T”) is a person entrusted with the management and operation of the above connecting roads by the Korea Highway Corporation vicariously exercising the authority to manage and operate the roads with the Incheon D&T connections. Defendant Han L&C Co., Ltd. (hereinafter “Defendant Han L&T”) is an insurer who entered into a comprehensive automobile insurance contract with respect to the M&T automobiles (hereinafter “instant E&M vehicles”). Defendant Samsung F&M Marine Insurance Co., Ltd. (hereinafter “Defendant Samsung F&T”) is an insurer who entered into a comprehensive automobile insurance contract with respect to the vehicle for the C&T freight vehicle (hereinafter “instant train”).

Around 12:59 on July 3, 2010, the instant Maz Vehicle of the instant traffic accident is running at a speed of about 50 to 60km in the direction of Incheon Airport in the direction of the Incheon Airport, while the instant Maz Vehicle of the Incheon Airport stopped at a speed of about 50 to 60km in the direction of the Incheon Airport, while the engine stopped at a point of 2.2 km on the Incheon Airport direction as it is impossible to identify the cause at a point of 2.2km on the Incheon Airport direction.

Around 13:15 on the same day, the instant bus driven at a speed of about 70 to 80 km per hour in the direction of the said Maz vehicle along the two-lane roads near the above YoungIC, and the instant bus driven around the time following the instant bus was proceeding at a speed of about 101.4 km per hour following the instant bus.

The tower of this case is found to be late back to the left-hand side of the vehicle which stops, while avoiding the vehicle to the left-hand side.

arrow