Text
1. All of the plaintiffs' primary claims are dismissed.
2. The defendant set out against the plaintiffs as shown in attached Table 1.
Reasons
1. Details of the disposition;
A. Some of the Plaintiffs filed an application with the Defendant for electric utility license for solar power generation projects, as described in the following [Attachment 1], along with Q, R, S, T, U, V, W, X, andY (hereinafter collectively referred to as “previous applicants”).
신청인 신청일 신청지 전기설비에 관한 사항 원고 B 2016. 8. 26. 전남 진도군 Z, AA (토지 : 1,300㎡, 99kW) - 원동력의 종류 : 태양광발전 - 주파수 : 60Hz - 공급전압 : 3φ4W 380V/220V - 설비용량 : 99kWp 원고 C 2016. 8. 26. 위 Z (토지 : 1,413㎡, 99kW) ″ 원고 J 2016. 8. 26. 위 Z, AA (토지 : 1,356㎡, 99kW) ″ Q 2016. 9. 22. 위 Z, AA, AB (토지 : 1,327㎡, 99kW) ″ R 2016. 9. 22. 위 AA, AB (토지 : 1,309㎡, 99kW) ″ S 2016. 9. 22. 위 AA, AB, AC, AD (토지 : 1,478㎡, 99kW) ″ T 2016. 9. 22. 위 AB, AC, AD (토지 : 1,632㎡, 99kW) ″ U 2016. 9. 22. 위 AE (토지 : 1,644㎡, 99kW) ″ V 2016. 9. 22. 위 AF, AE (토지 : 1,650㎡, 99kW) ″ W 2016. 9. 22. 위 AG, AH, AI, AJ (토지 : 1,650㎡, 99kW) ″ X 2016. 9. 22. 위 AH, AI (토지 : 1,650㎡, 99kW) ″ 원고 N 2016. 9. 22. 위 AK, AL, AJ (토지 : 1,674㎡, 99kW) ″ 원고 P 2016. 10. 4. 전남 진도군 AM (토지 : 1,335㎡, 99kW) - 원동력의 종류 : 태양광발전 -주파수 : 60Hz - 공급전압: 380V/22,900V - 설비용량 : 99kWp Y 2016. 10. 4. 위 AN, AM (토지 : 1,457㎡, 99kW) ″ 원고 N 2016. 10. 4. 위 AN, AO, AP (토지 : 1,457㎡, 99kW) ″ 원고 A 2016. 10. 4. 위 AQ, AR (토지 : 1,457㎡, 99kW) ″ [표1]
B. On November 6, 2016, the Defendant: (a) on the previous applicants on the seventh day of the same month, “each of the above applications site was located within 200 meters in a straight line from the main roads in accordance with Article 7(1)1 of the Guidelines for Operation of Permission for Development Activities of Jindo-gun; and (b) notified each of the above applications for non-permission (hereinafter “previous dispositions”).
Even if the electricity business license is a discretionary act, permission for development activities of Jindo-gun is granted in full view of the following circumstances: