(영문) 서울중앙지방법원 2017.10.27 2016가단5213537
물품대금
Text

1. The Defendant’s KRW 89,130,808 as well as the Plaintiff’s annual rate of KRW 6% from October 6, 2016 to October 27, 2017.

Reasons

(b) the facts of the basis;

A. The Plaintiff was awarded a subcontract for the system bath part among the construction works for the almp hotel in the almar almp hotel from a Changsung Construction Co., Ltd. (hereinafter “original construction”).

B. On May 19, 2016, the Plaintiff entered into a contract for the supply of materials (hereinafter “instant contract”) with the Defendant regarding the date to be used in the said system bathing room part (hereinafter “instant contract”) as follows.

Article 1. [Details of Orders] Article 1. 6.0 5. 5. 600 5, 450 Ma 216,500 89,600 Ma 216,50 89,600 Ma 3,785 box 3.785 box 3.0 / B (the defendant; hereinafter the same shall apply) prior to the delivery of the product, “B” shall submit samples in accordance with the order of “A (the plaintiff, the plaintiff, the same hereinafter)” and obtain the approval of “A”.

Article 4 (Inspection and Disposal of Defective Goods)

1. For products supplied by “B”, “A” shall conduct the primary inspection after verifying the name, size, and quantity of the products at the time of storage.

2. “A” may require the rejection and replacement of defective products of defective products supplied by “B” in the course of manufacturing the wall board and executing the floor-day construction, and “B” shall promptly supply defective products to “A” after recovery.

(In addition, “B” shall be supplied in consideration of the characteristics of the factory of “A” in the context of the production of “B”, as well as other days that meet the quality standards for domestic Twitty standards.

3. If damage, such as delay in the production of A, occurs due to the recovery of defective products and delay in the supply of normal products, “B” may require “B” to compensate for damage.

Article 5 (Time Limit of Delivery and Delivery)

1. The supply of a product shall be limited to the quantity passed by the inspection of “A”;

2. The delivery deadline of a product shall be in accordance with Article 1 and shall have been completed on June 20, 2016.

3. The place of delivery shall be the place designated by “A”.