logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2018.01.26 2017나2013968
채무부존재확인
Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff, including the part arising from the supplementary participation.

Reasons

(c) shall be.

A) The equipment is a facility that enables contact to create a oxygen cluster and remove the indoor residues, and then discharges it out to the outside through the air pande through the air pande. On the other hand, the detailed statement attached at the time of the above public announcement of tender (hereinafter referred to as “instant specifications”).

)The spatial tamping equipment subject to tendering shall be in one type, which is the tamping room, the inflow pumps room, the tamping room, and the tamping room in the tamping room, and each space tamping room in the tamping room (including tamping room, tamping room, tamper, UPS, MOP UPS, and MOPPP equipment are in part of the tamping room and the tamping room. The size and quantity of the tamping room are not indicated as follows. For example, the direct tamping room is not in size and quantity as to the tamping room, the tamping room, the tamping room, the tamping room in the tamping room, the tamping room in the tamping room, the tamping room in the tamping room, and the tamping room in the hacking room in the tamping room in the five space t.

Part 3. The following shall be added to inside of the third letter box “[the instant specifications].”

1. General specifications;

1.4. Requests related to the Corporation;

1.4.6) The submission and approval of the drawings and specifications (1) the contractor must submit to the supervisor the books specified in the list of the proposed drawings and specifications in paragraph 5 of this general year and obtain approval.

In addition, the contractor should make and install all equipment, including detailed pipes, by submitting a detailed manufacture and installation drawing of the equipment, and obtain the approval of the supervisor.

In the fourth letter box, the following 1 to 6(Ma)(hereinafter referred to as the “ma”) shall be raised as follows:

On December 17, 2015, the Dongm Name Technology Corporation, Inc. (hereinafter referred to as the "Dongm Name Technology Corporation"), which is the supervising team of the instant construction, (hereinafter referred to as the "Dongm Name Technology Corporation"), shall be the Plaintiff’s "space scamping facilities

arrow