logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2015.07.15 2013가합19439
손해배상(의)
Text

1. The plaintiffs' claims against the defendants are all dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. The party status DD (hereinafter “the deceased”) is the deceased’s husband, the Plaintiff B, and C are the deceased’s children, who were the deceased’s husband, the Plaintiff C, and the deceased, after the Defendant was discharged from the Gansan Hospital’s hospital under the diverseing dyeing surgery, both of whom and both sides, after being discharged from the Gansan Hospital operated by the Defendant National Health Insurance Corporation.

B. On November 28, 2012, the Deceased during the period of medical examination and treatment at the Masan Masan Hospital: (a) was conducted to undergo a diagnosis at the Masan Masan Hospital; (b) as a result, the result of the diagnosis was decided to conduct a Maternic surgery; and (c) accordingly, on December 3, 2012, the two months were hospitalized at the above hospital.

5. From 14:00 to 16:00, he/she was subject to diversical grhe/sheging in duna, both arms and horses, and both sides of it;

2) After the operation, the medical personnel of the Ilsan Hospital allowed the Deceased to drink his gas from December 7, 2012, when gas was boomed to the Deceased. On the other hand, on December 8, 2012, when gas was boomed to the Deceased. On the other hand, at around 06:45 on December 8, 2012, the Deceased gas was boomed to the Deceased. 3) around 07:30 on December 10, 2012, the Deceased was boomed by an acute pain (abomin, frequency and sustainable time: bombomines to the Deceased: the body of the deceased, the body of the deceased, and the body of the deceased, the body of the deceased, the body of which was boomed to 3000 square meters, and the deceased was boomic to the strength of the deceased, and the deceased was boomed to 3000 square dust.

After that, on December 10, 2012, the Deceased discharged on or around 09:0, and at the time, the blood pressure of the Deceased was 140/90mHg, 36.6mHg, physical temperature, 76 times/mination, 20 times/mination.

4) On December 17, 2012, the Deceased, as agreed upon at the time of discharge, was provided with punchers and diagnosis and treatment at the Japanese Hospital on December 17, 2012. The Deceased shall be provided with punchers and sunching (one time, a sunching).

arrow