(영문) 서울중앙지방법원 2016.12.23 2012가합101881
손해배상(기) 등
Text

1. All of the plaintiffs' lawsuits of this case are dismissed, which are the amount of Attached 3, 3, 3, and 4, 30 won.

2.

Reasons

1. Basic facts

A. 1) The Plaintiffs are the parties to the dispute. The Plaintiffs are the C apartment in Gangnam-gu Seoul Metropolitan Government (hereinafter “C apartment”).

2) The building owner of the apartment site in this case is the reconstruction association established for the housing construction project that removes existing apartment units on the ground of Gangnam-gu Seoul Metropolitan Government D (hereinafter “instant land”) adjacent to the boundary of the north of the instant apartment site and constructs A primary apartment units (hereinafter “the instant construction project”), and the merged Samsung C&T Co., Ltd. (hereinafter “T&T”) is the construction project of the instant construction project.

B. Around 2010, the Defendant Samsung C&T was selected as the trial contractor for the instant construction. Defendant Samsung C&T was the foundation for the instant construction from the immediately following date, and the construction of soil cutting and underground excavation from the instant land (hereinafter “the instant foundation construction”).

(2) In executing the above construction, Defendant Samsung C&T adopted the removal type poppy method as a construction method for underground soil strawing construction. The above construction method, at the time of the foundation construction, installed earth walls so that the soil from the side does not collapse to the inner side while excavating the entire site of the building at the time of the foundation construction. At the same time, seal materials consisting of the strong line of several ductss between the inner part of the earth wall and the lower part of the earth wall, as shown in the attached Form 6, connected to the earth wall as shown in the attached Form 6, connected to the ground of the site of the C apartment site adjacent to the earth wall, inserted it in the direction of a private line, inserted it into cement, mortar, etc., and then cut it into the lower part of the lower part of the earth wall, thereby supporting the earth and the lower part of the lower part of the lower part of the earth wall.