logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.09.22 2016가단5123450
손해배상(자)
Text

1. The Defendant: (a) on May 21, 2015, the Plaintiff KRW 1,00,000 for each of the said KRW 45,967,222, Plaintiff B, and C; and (b) on each of the said KRW.

Reasons

1. Occurrence of liability for damages;

A. 1) D is the E-Poter 2 Cargo (hereinafter “Defendant”) around 12:00 on May 21, 2015.

) A driver was driven by the Defendant’s front part of the bicycle right side of the Plaintiff A driver, crossinging the road to Daejeon while driving the street on the upper part of the Sejong-si in the front part of the Defendant’s vehicle while driving the street on the upper part of the Sejong-si in the front part of the measure taken (hereinafter “instant accident”).

2) As a result of the instant accident, the Plaintiff A suffered bodily injury, such as a chest emitting a chest.

3) Plaintiffs B and C are the children of the Plaintiff, and the Defendant is the insurer that concluded the insurance contract for the Defendant’s vehicle. According to the above recognition of liability, the Defendant is liable for the damages suffered by the Plaintiffs due to the instant accident as the insurer of the Defendant’s vehicle. (c) At the time of the instant accident limiting liability, the Plaintiff: (a) was crossing the road on the left-hand-hand-hand-hand-hand-hand-hand-hand-hand-hand-hand-hand-hand-hand-on-hand-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-hand-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-on-way-way-on-way-on-way-on-way-on-way-on-way-way-way-

2. In addition to the matters stated below within the scope of liability for damages, each corresponding item of the Schedule of Calculation of Compensation for Damages shall be as follows, and in principle, the period for the convenience of calculation shall be calculated on a monthly basis, but less than the last month and less than KRW 1 shall be discarded.

The amount of damages shall be calculated at the rate of 5/12 per month.

arrow