(영문) 서울북부지방법원 2016.04.21 2014가합24178
손해배상(기)
Text

1. Defendant B and C jointly share KRW 37,808,966 to the Plaintiff, and Defendant B jointly share the same on September 2014.

Reasons

1. Basic facts

A. On July 25, 201, the Plaintiff: (a) leased a building of 198 square meters of a Class 2 neighborhood living facility No. 198 square meters (hereinafter “instant building”); and (b) operated a factory that produces households, such as beauty artists, in the name of “G” in the instant building, after the lease of the sloping-dong-gu Seoul Metropolitan City E and F-ground general steel structure sloping; and (c) the instant building.

B. (1) On April 26, 2012, D contracted the construction work for installation of solar power plants to Defendant P&S Engineering Co., Ltd. (hereinafter “Defendant P&S”) on the roof of the instant building at KRW 108,90,000.

(2) On August 24, 2012, Defendant P&S subcontracted to Defendant B (hereinafter “Defendant B”) the supply and installation work of solar structures during the installation work of the above solar power plant in KRW 90,00,000. Defendant B subcontracted to H on the same day, Defendant B re-subcontracted the assembly of solar structures and the installation work of the installation work of the solar power plant in KRW 6,90,000,00 on the condition that Defendant B provided H with materials, such as solar cell boards, servers, and access teams, during the installation work of solar structures.

C. On September 24, 2012, H instructed Defendant C, who is a daily worker, to perform the construction of a steel bridge for the inspection of solar power plants in the instant building, and ordered Defendant C to perform the work without being equipped with a fire extinguisher at the work site even if the above work is accompanied by a melting work.

피고 C은 2012. 9. 24. 13:00경 이 사건 건물 지붕 위에서 용접 작업을 하였는데, 용접 작업 과정에서 튄 용접 불꽃으로 인하여 이 사건 건물에서 화재가 발생하여 이 사건 건물이 전소하는 사고가 발생하였다

(hereinafter referred to as “instant fire accident”). E.

The Plaintiff suffered damage from all the fire, such as machinery, materials, etc. owned by the Plaintiff within the instant building due to the instant accident.

(f) The fire-fighting team is the defendant as a result of the fire site investigation.

arrow