logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2018.04.26 2016가합51958
용역비
Text

1. The plaintiff's main claim is dismissed.

2. The Defendant’s KRW 429,00,000 for the Plaintiff and its related expenses on May 25, 2016.

Reasons

1. Basic facts

A. The Plaintiff is a company with the objective of building design, supervision of construction works, and consulting services related to construction. The Defendant is an association established for the purpose of implementing a housing redevelopment improvement project (hereinafter “instant rearrangement project”) in the Seocho-gu E Board in Changwon-si, Seoul Special Metropolitan City.

B. The Plaintiff and the instant promotion committee entering into a design service contract between the Plaintiff and the instant promotion committee

On November 3, 2006, the Plaintiff publicly announced the selection of the designer of the instant rearrangement project and resolved to select the Plaintiff as the designer of the instant rearrangement project by holding an extraordinary general meeting on November 25, 2006. (2) On February 2, 2007, the Plaintiff and the Plaintiff Co., Ltd. (hereinafter “G”) entered into a design service contract for the instant rearrangement project (hereinafter “instant 1 service contract”) with the instant promotion committee, and the main contents are as follows.

(1) Under the following contract, “A” and “B” refer to the Plaintiff and G. Article 3 (Scope of Services) (1) B perform the following duties concerning the Housing Redevelopment Improvement Project implemented by A:

1. Preparation of design documents necessary for formulating a project plan and applying for designating a rearrangement zone;

2. Consultation on and support for technical matters concerning formulation of a rearrangement plan and designation of a rearrangement zone;

3. Preparation of design documents necessary for an application for authorization for project implementation; 12. Preparation of project implementation plans for the construction, structure, electricity, facilities, soil mounds, civil engineering, landscaping, and landscape landscaping; 14. Preparation of design documents for the design drawings; 18. Consultation on design changes and preparation of the revised design documents; 19. Preparation of construction reports; completion inspection; and other necessary matters;

arrow