logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.05.17 2015가합539272
손해배상(기)
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Facts of recognition;

A. The Plaintiff is a company that manufactures and sells electric power and electronic devices, and Defendant Symna Co., Ltd. (hereinafter “Defendant Symnaty”) for the purpose of manufacturing and selling them, and Defendant Symnaty batteries Co., Ltd. (hereinafter “Defendant Symnaum batteries”) for the purpose of manufacturing and selling various storage batteries.

B. On July 9, 2013, the Plaintiff entered into a contract with the Incheon Regional Government Procurement Service on the supply and installation of anless electric power source (UNS) to the UPS room (hereinafter “UPS room”) within the Kimcheon-si Office (hereinafter “UPS”), which is located in 141 as the electric power source of Kimcheon-si, with the non-party National Agricultural Product Quality Management Service (hereinafter “UPS room”), and as a result, entered into a contract with the Non-party 355,63,000 won.

The specific delivery and installation items under the above contract are two UPS machinery, two distribution units, three hundred distribution units, one form of MBP panel, UPS and one distribution line cables, and two distribution units for storage of distribution units.

C. On September 27, 2013, the Plaintiff purchased 360 shippers produced by Defendant Sympum batteries (hereinafter “instant shippers”) from Defendant Sympum, and at the time, Defendant Sympum agreed to request Defendant Sympum to install the instant shippers.

On November 23, 2013, the Plaintiff first installed two UPS machinery and two spons for storage of distribution machines in the UPS room, and the Defendant Spack batteries installed the instant spons by dividing the instant spons by 180 each of the instant spons into two parts (hereinafter “spons”). Finally, the Plaintiff performed the sponsing work between UPS machinery and distribution banks.

The Plaintiff, at the time, assigned the connecting cable starting from the UPS machinery at the time to the cable pole in the form of a bridge installed in the air above the UPS machinery, leading to the shipboard bank board. Some of them are inside the shipboard bank 1.

arrow