(영문) 대구고등법원 2014.02.13 2013나783
하자보수비 등
Text

1. The judgment of the first instance court, including the Plaintiff’s claim extended at the trial room, shall be modified as follows:

The defendant.

Reasons

(b)in comparison, the construction cost was calculated based on the 7th floor drained on the 8th rooftop floor and the sub-construction was confirmed, and the physical trace was not inspected in accordance with the fluor load, thereby calculating the difference in the construction cost to build sirens in accordance with the relevant drawing;

(A) The reasons why the Defendant’s assertion against the non-construction defects in the section for common use are excluded are as follows.

The ground for rejecting the defendant's assertion

1. It was constructed in the same manner as the height design drawings by underground parking lot lamps and driving roads.

According to Article 6 of the Enforcement Rules of the Parking Lot Act, the height shall be at least 2.3 meters from the surface of the parking floor, but it is a defect because it is confirmed to be at least 2.28 meters in the height of the 109-dong underground parking lot lamps, 2.15-26 meters in the upper height of the 109-dong parking lot.

2. It is not a defect since it is intended to prevent damage to a vehicle due to shock by a RV vehicle, etc. when the height of an underground parking lot mardum drums is lower than that of an underground parking lot.

It is confirmed that construction (W300*H150) has been carried out differently from the approved drawings (W300*H220), and this is likely to cause damage to the vehicle in the event of a vehicle collision.

If the annual height is the same as the drawing, there is no evidence that the collision by the RV vehicles, etc. is recognized.

3. There is no provision in terms of the specifications of the project to be exposed adjacent to the toilet walls and subsidiary facilities.

Along with the provisions that the Moroccco Corporation - the other side of the general matters attached to the construction works standard specifications and the Kenya Corporation - the other side of the works - 3.1 is exposed to the other side, the Morocum shall be in violation of the provisions that it shall not directly see the other side by using the copile or processing the Moroc

4. It has been terminated by the primary defect of underground parking lot spamper pipe-type.

It is judged that corrosion was caused by the pipes hole, which had been at the time of installation, and there was a number of remunerations, but the complete resolution was not made. Therefore, it is necessary to replace the pipes for safety and function.

5.Design drawing which has not been installed with the main entrance and exit system upper cover.