1. The Defendants (Counterclaim Plaintiff) are jointly and severally and severally liable to the Plaintiff (Counterclaim Defendant) for KRW 2,835,366 and the amount from June 3, 2016.

Reasons

The main lawsuit, counterclaim is also considered.

Ⅰ. The facts under the premise of the determination are without dispute, or recognized as the purport of the whole pleadings, other than each macroscopic evidence.

1. On November 2, 2015, the Plaintiff: (a) on November 2, 2015, entrusted the Defendants with the interior interior interior interior interior interior interior interior of the house.

[A] The initial construction period was anticipated to be one week.

2. The first construction cost was determined in 12,399,310 won, and agreed to perform an additional construction work in the middle.

[A 2] 3. The content of the interior contract is as follows (A 1) and the calculation of the total construction cost, including additional construction, are as follows:

[A] D. D D D D D D D D D E F H G

4. In addition, with respect to the quality of the tesen’s product to be constructed by the Defendants or its construction method, the Plaintiff’s additional outlines as follows:

The Office Port was delivered.

[A] 5. The plaintiff paid 8 million won to the defendants as advance payment of construction work.

6. If the Defendants arranged the particulars of the progress of the important construction work by day, it is generally as follows:

On November 11, 2015, the details of the progress of the fake construction are as follows: (a) on November 12, 2015, the removal of a wooden board from the removal seal “indoor Smoking”; (b) on November 13, 2015, the second stud door-to-door removal of toilets; (c) on November 13, 2015, between the entrance door and the middle door of the entrance, the space in which the wall “an empty space” was installed; and (d) on November 14, 2015, the removal of toiletss from the removal seal to the removal seal; and (d) on November 14, 2015, the second 2015, the removal of toiletss from the removal seal-to-door removal seal-to-door removal seal-to-door construction; (e) on November 16, 2015, the second 15, 2015, the installation of the wall-to-door removal 30 meters of the wall.