(영문) 서울중앙지방법원 2016.02.12 2014가합8061
손해배상(기) 등
Text

1. The Plaintiff:

(a) Defendant B and C jointly KRW 173,89,178;

B. Defendant C Co., Ltd.

Reasons

1. Basic facts

A. 1) The Plaintiff is a party in the position of the Plaintiff, as follows, Defendant Sung Chang Enterprise Co., Ltd. (hereinafter “Defendant Co., Ltd.”) among the new construction works of D apartment 1 and 2 complexes.

)에 하도급한 회사이고, 피고 회사는 마루판 및 특수합판 제조, 판매업 및 토목건축공사업 등을 영위하는 회사로서 원고로부터 아래와 같이 마루공사를 하도급받은 회사이다. 2) 피고 B은 원고의 공무팀 차장으로서 원고가 수행하는 공사를 외부 공사업체에 하도급하는 업무 및 각 공사현장의 공사대금 및 기성금 청구 관련 업무를 담당하던 사람이고, 피고 C은 피고 회사에서 위 마루공사 관련 업무를 담당하던 사람이다.

B. 1) The Plaintiff’s land trust (hereinafter “Korea Land Trust”) Korea Co., Ltd. (hereinafter “Korea Land Trust”).

2) On the ground of Gyeonggi-si, Gyeonggi-si, and Gwangju-si, “D apartment 1 and 2 new complex construction works.” On September 8, 2008, the Defendant Company received a supply of “D apartment 1 and 2 complex construction works” on the land outside Gwangju-si, and on September 8, 2008, the ridge construction among the above construction works (hereinafter “1 complex floor construction”) and “the instant ridge construction works” when combined with the above construction works.

The construction period is from September 10, 2008 to March 31, 2010; the construction amount is from September 10, 2008 to March 31, 201; the construction amount is from 904,629,360 (the supply price is KRW 856,00,000; labor cost is KRW 187,530,360; value-added tax is KRW 48,629,360); and the two complex construction work is from 723,912,00 won (the supply price is KRW 70,00,000; labor cost is KRW 151,00,018,00; value-added tax is KRW 23,912,00; and when each contract is combined, the subcontract is referred to as the “instant subcontract”).

(1) The Defendant Company shall include the terms and conditions of this contract, design drawings (construction specifications, design drawings and site descriptions).

However, the total unit price contract.