Text
1. Defendant F Co., Ltd.: (a) from December 31, 2012 to February 6, 2015, each of the Plaintiffs’ KRW 18,909,610 and each of the said money.
Reasons
1. Basic facts
A. The relationship between the parties (1) The Plaintiffs are the owners of one-fourths shares in each of the 1/4 shares of the 3-class storage facilities of the Ilyang-gu G, Seoyang-gu, Goyang-si, H Yangyang-si, and the sloping roof 3-dong (hereinafter “instant burning building”).
(2) Defendant F Co., Ltd. (hereinafter “Defendant F”) leased and used the first ground buildings (acquisition of ownership on March 2, 2004; hereinafter “the instant chemical building”) owned by Defendant E as the company engaged in the business of manufacturing Seodaemun-gu, etc. as the representative director, and used it as a factory.
B. (1) On December 31, 2012, a fire was reported to the Japanese fire fighting unit around 09:58 on the same day as the fire occurred in the instant fire fighting building.
(2) At the time, the Defendant Company J, who had been working in the front container office of the instant fireproof building, was reported to the effect that the instant fireproof building was postponed, and became aware of the fire. While the Defendant Company attempted to extinguishing with other employees of the Defendant Company, it failed to extinguish the fire by using a manual fire extinguisher with other employees of the Defendant Company.
(3) At around 10:08 on the same day, when a fire-fighting vehicle arrives at the first fire site, the point of compliance room in the instant fire-fighting building was a strong fire fighting engine and it was in the front and front of the fire-fighting engine, and a large-scale inspection from the second freedom in the vicinity of the instant fire-fighting building was to have been witnessed.
(4) Although the fire fighting team attempted to extinguish a fire with the cooperation of fire fighters, etc. in the vicinity of the mountain fire fighting team, the fire of this case was larger than the size of the fire of this case, and as soon as the burning speed was high, a considerable portion of the buildings nearby the fire of this case, including the burning building of this case, was destroyed by a fire at around 13:25 on the same day.
(hereinafter “instant fire”). C.
(1) As a result, the fire investigation and analysis team on the fire site is to conduct a fire investigation on the fire of this case.