(영문) 광주지방법원 2015.10.16 2013가합6768
공사대금 등
Text

1. The Defendant’s KRW 142,573,00 for the Plaintiff and KRW 5% per annum from August 9, 2013 to October 16, 2015.

Reasons

1. Basic facts

A. Status 1 of the parties) The Defendant is a net international quota exhibition in 2013 (hereinafter “garden exhibition”).

(2) In order to hold the instant construction contract, the Defendant entrusted the Plaintiff with the construction contract and the construction contract (hereinafter “instant construction contract”). The Plaintiff’s trade name was a “stock company construction” at the time of the conclusion of the instant construction contract, and was changed to the “stock company D” on April 1, 2015 and changed to the “stock company D”) as of June 1, 2015 (registration of June 9, 2015). The Plaintiff is the contractor of the said construction contract.

B. 1) The instant construction contract was concluded between 1 and 3. The instant construction contract was concluded between 201 and 201. The instant construction contract was concluded as follows. The number of the first and third construction contract was 1 to 201, and the total construction cost was 1 to 201.3: from 28 to 2012. (the date of the final construction completion, including 1 to 3th: 20,094, 000, 248, 897, 000, 000 won; 20.1 to 20.3,000, 201, 200, 200, 1 to 206.3, 206, 201, 206, 201, 201, 206 to 3.4, 206, 201, 207, 201, 201.