Text
1. The plaintiff (appointed party)'s appeal is dismissed.
2. The costs of appeal shall be borne by the Plaintiff (Appointed Party).
Reasons
1. Basic facts
A. From March 201, the Plaintiff and the selector (hereinafter “Plaintiff, etc.”) had resided in Dobong-gu Seoul Metropolitan Government (hereinafter “instant apartment”) Cdong D from March 201.
The defendant is the council of occupants' representatives of the apartment of this case.
B. From the end of March 2011, the Plaintiff et al. resided in the top floor located immediately below the mechanical room, and caused serious inconvenience and suffering in daily life due to noise and vibration generated during the operation of the instant apartment C (hereinafter “instant elevator”). From the end of March 2011 to March 2015, the Plaintiff et al. continuously filed a civil petition demanding measures to prevent noise from the instant elevator noise by demanding the Defendant and the managing body of the instant apartment from the end of March 201 to the end of March 2015.
일시 조치 2011. 7. 20. 입주자대표회의에서 일정기간 소음을 측정한 뒤 다음 회의에서 측정 자료를 기초로 재논의하기로 의결 2011. 8. 19. 입주자대표회의에서 세대 내 소음을 측정하여 기준치와 비교하여 보완하기로 의결 2011. 12. 8. F에 의해 기계실 기계대 방진 고무 교체작업 2013. 7. 2. E에 안전진단비용 견적을 의뢰 2013. 10. 24. G에 의해 웜기어 등 교체작업 2013. 12. 19. 입주자대표회의에서 방음설비공사를 실시하기로 의결 2014. 1. 22. - 2014. 2. 3. 주식회사 H에 의해 기계실 방음벽 공사 2014. 2. 21. 입주자대표회의에 승강기안전진단 의뢰 안건이 상정되었으나 부결 2014. 9. 19. 입주자대표회의에서 선정자가 참석하여 이 사건 승강기 소음에 관한 의견을 제시하였고, 브라켓 방진고무 보수하기로 의결 2014. 11. 3. G에 의해 승강로 최상층부터 3개층에 방진고무 설치작업, 승강기 운행속도 조정 2015. 3. 5. E 직원들이 이 사건 승강기 등을 점검한 뒤 소음은 승강기에서 시작되지만 건축...