Text
1. Defendant C Co., Ltd.: (a) KRW 49,678,598 on the Plaintiff and 5% per annum from July 16, 2015 to February 15, 2017.
Reasons
1. Occurrence of liability for damages;
A. Facts of recognition 1) Defendant C Co., Ltd. (hereinafter “Defendant Co., Ltd”).
The purpose of the elevator installation business is the corporation established for the purpose of the elevator installation business, and the defendant B is the representative director of the defendant company. 2) The defendant company replaced the elevators of Gwangju North-gu D apartment from May 2015 to July 201 of the same year.
3) On July 16, 2015, the Ministry of Strategy and Finance, F, G, H, I, and the Plaintiff, affiliated with the Defendant Company, are the instant elevator 11 elevators (hereinafter “instant elevator”).
(1) In order to replace the instant elevator, E The Vice-General was put into the replacement work work. To replace the instant elevator, the Vice-General was able to cut Belgiuming across the uppermost leveet, connect the middle of Belgium and the upper part of the elevator to chain block, link the elevator’s right part with leveling by connecting the elevator with leveling. While the Plaintiff and I were engaged in the work of drawing up the elevator by going on the elevator of this case, the level connecting the levelet with the above Plaintiff and I cut down at around 16:45 meters, and the elevator was crashed by 35 meters below level, and the Plaintiff died with the upper part of the upper part of levelet (hereinafter “the instant accident”). They died with level with the upper part of level (hereinafter “instant accident”).
(ii) [based on recognition] unsatisfy, Gap evidence 1 to 17 (if any, including branch numbers; hereinafter the same shall apply);
each entry, video, and the purport of the whole oral proceedings
(b) Employees of the Defendant Company, such as the 1 E deputy head, in the course of carrying out the work of selling elevators, shall connect the elevator center and the machine room string to one labelling, connect each from both ends of the elevator to one labelling, and attach a protective unit so as not to damage leveling connected to the Luxembourg, and if it is impracticable to use the mechanical room strings, a separate string strings shall be AnhkV.