(영문) 인천지방법원부천지원 2016.08.24 2015가합1665 (2)
배당이의의소
Text

1. Defendant Hyundai Marine Fire Insurance, among the distribution schedule prepared by this Court on June 10, 2015, in this Court A A distribution procedure case.

Reasons

1. Basic facts

A. The Plaintiff is a party’s position 1) The Plaintiff’s ground factory 487 and 7 lots of land (hereinafter “Plaintiff factory”).

A) A company engaged in the business of manufacturing stegras in the stegra, etc., and the gold ste Co., Ltd. (hereinafter “gold ste”).

) The Plaintiff’s factory and shuttle 2nd line road are the 469-2 ground factory of Cheongpo-si, Jeju Gopo-si, Gopo-si, Kimpo-si (hereinafter referred to as “gold Pak-si factory”).

(2) The Defendant Hyundai Sea is an insurer who has concluded each insurance contract as indicated in [Attachment 1 and 2] between the Plaintiff and the Plaintiff as the insured. The Defendant Heungdong Fire is an insurer who has concluded a fire insurance contract with the trimulter Co., Ltd. (hereinafter referred to as the “trimuler”) that is the victim of a fire accident, and the Defendant Handong Fire Insurance is an insurer who has concluded a fire insurance contract with the victim of a fire accident as the insured. The Defendant Handong Fire Insurance is an insurer who has concluded a fire insurance contract with the victim of another fire accident as follows.

B. At around 13:30 on June 9, 2013, B, who received a contract for the work to build a factory from the spam S, the fire occurred that was loaded at approximately one meter away from the site of the work, and the fire that was loaded at approximately one meter away from the site of the work, and the above fire was moved to the Plaintiff’s factory that was adjacent to the sphere sphere sphere sphere sphere sphere sphere sphere sphere sphere sphere sphere sphere sphere.

(hereinafter referred to as “instant accident”). C.

After the occurrence of the instant accident, the Plaintiff received the Plaintiff’s fire insurance money: (a) KRW 373,505,606, and KRW 838,440,332, and KRW 1,211,945,945, with the fire insurance money in accordance with the insurance contract stipulated in the attached Table No. 1 of the attached Table No. 1 of August 30, 2013; and (b) KRW 838,440,332 with the fire insurance money in accordance with

arrow