(영문) 서울중앙지방법원 2015.01.15 2013가합88046
구상금
Text

1. The Defendant’s KRW 445,087,292 as well as 5% per annum from August 24, 2013 to January 15, 2015 to the Plaintiff.

Reasons

Facts of recognition

Bigbenben Co., Ltd. (hereinafter referred to as "SPP") is a company that manufactures and sells motor vehicle parts at a factory located in 124 no. 2 p.m. (hereinafter referred to as "SPP") in Gwangju Mine-gu, Gwangju. The defendant is a company that manufactures rubber products and manufactures f.m. 118 p.m. (hereinafter referred to as "Defendant factory") in a factory located in PPPP-gu, Gwangju (hereinafter referred to as "SP-PP-PP-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P-P

The Plaintiff concluded a fire insurance contract with regard to a gender-free factory, etc. between gender-free and gender-free, as described in the following table:

(hereinafter referred to as “instant insurance contract”). On May 6, 2013, the occurrence of a fire and the payment of insurance money occurred in the scrap crushing machine located in the Defendant factory (hereinafter referred to as “instant fire”), and the Defendant’s employee discovered the said fire and informed other employees of the fire, and attempted to extinguish the fire by means of a fire hydrant. However, the fire by strong wind expanded to a frisome factory, and thus, it was entirely destroyed by a large wind.

The Taeyang Fire Special Adjustment Co., Ltd. investigated the damage caused by the fire of this case such as the sexual rain plant, machinery, etc., and assessed the damage caused by the sexual rain in total at KRW 1,287,929,785 as indicated below.

The Plaintiff paid KRW 638,276,760,000,000,000,000 won as insurance money, and KRW 378,276,760,00,000 on August 23, 2013, according to the insurance contract of this case, to sexual leapex.

As a result of the investigation of the fire of this case, the clerk of the National Science Investigation Institute shall be determined by the electrical heat generated in the course of damage to the small or medium lines or smoke, from the small or medium parts of the 1 log (heat) installed inside the rupture of the rupture and electric power supply lines installed in the rupture of the rupture in the Defendant factory.