logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 의정부지방법원 2016.06.15 2015고단4680
수질및수생태계보전에관한법률위반
Text

Defendant

A Imprisonment for six months, and Defendant B shall be punished by a fine of 5,000,000 won.

However, the defendant A.

Reasons

Punishment of the crime

Defendant

A is the defendant B representative director, who is a factory and chromosome company, textile in both weeks.

1. Defendant A

(a) In order for a person who has obtained permission to discharge wastewater in excess of the permitted volume of wastewater discharged to be changed to not less than 50/100 of the permitted volume of wastewater discharged, the permission shall be obtained from the competent authorities;

The Defendant discharged wastewater in excess of 38.4 cubic meters per day from May 15, 2015 to September 17, 2015 from the place of business of a stock company B from May 15, 2015, in excess of 38.4 cubic meters per 200 cubic meters per day, and did not obtain permission for alteration from the competent authority.

(b) No person shall operate wastewater discharging facilities without obtaining permission.

The Defendant obtained permission only for laundry facilities, and installed 6 high-tension chlouds (1st, 500 g, 3st, 150 g, 100 g, 1st, and 100 km) which are wastewater discharging facilities at the same time and place as above, without obtaining permission for fiber and processing facilities, and operated them using them.

2. Defendant B is a corporation established for the purpose of processing, etc. of fiberss.

The defendant, a representative director, discharged wastewater in excess of the permissible discharge amount of wastewater without permission from the two main markets with respect to the defendant's business at the time and place specified in paragraph (1), and operated wastewater discharge facilities without permission.

Summary of Evidence

1. Defendants’ respective legal statements

1. A protocol concerning the examination of a suspect against the defendant A;

1. Written statements;

1. Each investigation report (inspection as to whether designation has been made, such as areas, districts, etc., and reporting accompanied by the sub-committee for water pollutants discharge);

1. The mark of inspection of the emission facilities, confirmation letter, sample collection confirmation, business registration certificate, certified copy, permit for the installation of wastewater discharging facilities, the purchase ledger of raw materials and salt, the place where the wastewater discharging facilities and water pollution prevention facilities are operated, a copy of the land utilization plan (including restrictions on activities), and the result of inspection;

arrow