(영문) 창원지방법원 2016.07.21 2014가합2327
채무부존재확인
Text

1. As to the real estate indicated in the separate sheet dated June 24, 2013 by the Plaintiffs (Counterclaim Defendant) against the Defendant (Counterclaim Plaintiff).

Reasons

On the premise that around June 2013, the Defendant was awarded a contract with the Plaintiffs (hereinafter “instant construction”) for remodeling construction works for the building with the 3th floor, 302 square meters, 155.34 square meters, 4th floor, and 5th floor Fresh (hereinafter “the instant building”) among E stores located D in the window of Changwon-si, Changwon-si, and agreed as follows.

(hereinafter “the instant construction contract”). The location of real estate in the real estate agreement of the construction contract: Fns (302, 4, 5 stories) located in the window D of Changwon-si in the general accommodation business. The remodeling project for living accommodation in the general accommodation business

1. The plaintiff A (owner) refers to "A" defendant (person in charge of construction work) "B"

2. The total construction cost: ① 285,000,000 won.

3. Period: From June 24, 2013 to September 30, 2013.

4.A shall pay 10 per cent of the total construction cost, and the remainder of the construction cost shall be paid by B.

5.With respect to a construction contract, Section B shall be bound to pay all the proceeds of the construction work by depositing in the passbook in the name of Section A and shall submit to Section A all the construction contract and tax invoices.

6. The construction cost borne by the Party shall be paid in full within two months after the completion of the construction (after the completion of permission for accommodation business) and shall be borne with interest at least ten percent per annum in arrears;

7. If B fails to pay the construction period for more than one month, the interest of 10% per annum on the construction cost shall be borne.

8. In the event that it is impossible for A to operate studio due to the suspension of construction work of B, B shall be liable for all the liability for damages incurred therefrom.

9. All projects shall be based on design drawings, and shall consult with each other, if necessary, on the field conditions.

Items for estimate (underlying part)

1.The contract shall be prepared by the husband and wife.

2. The content of the construction shall be referred to in the drawing.

However, it shall be referred to as the drawing, and it shall be based first on the field.

3. The cost of construction shall be 29,208,000,000 won including the safety inspection.

4.Additional dues shall be separate, and personnel expenses shall be excluded from Additional dues.

(20 million won)

5. When executing construction works for Gap (Divisions).