Text
1. The Defendant’s KRW 38,400 as well as its annual rate from January 15, 2014 to November 9, 2016 to the Plaintiff.
Reasons
1. Basic facts
A. On January 15, 2014, at around 11:30, the Plaintiff started the front of the Seo-gu Seo-gu Daejeon apartment, which was dried, the front end lid of the front part of the crosswalk. However, due to damages to the front end lid, the Plaintiff’s front end lid caused an accident (hereinafter “instant accident”) to see and see the road floor by the left hand as the Plaintiff’s right bridge is left on the wind.
B. After the instant accident, the Plaintiff received the following medical treatment and treatment.
C. Department other than C: D hospital under diagnosis of the trophe base, right upper part, and slife base, the left upper part and slife base, the examination and treatment from January 15, 2015 to January 18, 2015: The examination of the escape certificate (round 4 -5 ) of conical signboards was conducted on January 21, 2014, and the examination was conducted on January 21, 2014, by 30 days from January 19, 2014, by 14 1,50 days from the 30th of February 19, 2014, by the 14th of March 25, 2014 (round 14, 2014) and the 14th of March 25, 2014 (round 14, 2014).
C. The Defendant is a local government that installs and manages roads and manle at the site of the instant accident.
【Ground of recognition】 The fact that there has been no dispute, entry of Gap's 1 through 8 (including each number), the purport of the whole pleadings
2. The plaintiff's assertion and judgment
A. The alleged accident occurred due to the defect in the installation and management of the last lids at the site of the instant accident managed by the Defendant.
The plaintiff 1-B due to the accident of this case.
On the wind that has suffered the same injury as described in the port, or the king with aggravated or potential illness, the following damages are incurred to the Plaintiff: 29,351,650 won (=10,000 Won 9,351,650 Won 10,000).