1. The Defendant (Counterclaim Plaintiff) paid KRW 32,065,00 to the Plaintiff (Counterclaim Defendant) and the Plaintiff’s counterclaim from October 12, 2017 to May 31, 2019.

Reasons

A principal lawsuit and counterclaim shall also be deemed a principal lawsuit and counterclaim.

1. Basic facts

A. The Plaintiff is a stock company established for the purpose of running the parts manufacturing business, and the Defendant is a stock company established for the purpose of selling parts manufacturing business.

B. On March 10, 2017, the Plaintiff entered into a contract with the Defendant for the supply of “the instant gregnating machine” (hereinafter “instant gregnating machine”) with the following terms and conditions (hereinafter “instant contract”).

Article 1(Purpose of the Contract)(1) This contract product is “A” (the defendant is named, hereinafter the same shall apply) as a flaz electric source for the removal of white lead (the fluor, smoke), fluor, smelling, etc.

(B) “B” (referring to the Plaintiff; hereinafter the same shall apply) to meet the requirements of

)This product is produced and supplied to the workplace of Party A, and Party A shall determine all necessary matters in relation to the receipt and use of the product. Article 2 (Name of Contract, Amount, scope of construction, date of completion of construction): 39,150,00 won (VAT Map 3): The scope of the electrical construction (in the case of installation of artificialter and operating team), including 10M (in the radius, 10M), electric-processing tank, storage tank, backline, water tank, heating pipe, water pipe, water pipe, steel pipeline, steel pipeline, installation of electric power equipment necessary for the operation of electric power equipment, such as pipes, exhauster, exhauster, exhauster, exhauster, and exhaustr, etc.: the steel structure at the place where the electric power equipment is located shall be referred to as “a steel structure” and the “a steel structure” shall be referred to as “a steel structure” provided.

(4) The date of completion of installation (the starting date): Within seven days after the completion of the steel structure in which the electric regravator is located, Article 3 (Method of Contract) A shall deposit the total amount of 25% (10,000,000, and VIAT separate account in the designated account of B at the time of ordering the order.

2 B shall provide Party A with the results of on-site trial operation after installation of equipment, and Party A shall not be abnormal after trial operation.