1. Defendant G:
A. The co-ownership of the real estate listed in the separate sheet Nos. 1 and 2 to the Plaintiff A.
Reasons
Facts of recognition
According to the completion of a land readjustment project, the rate of reduction of 35.72% is applied to the standard cadastral records 232.2 in the Dong-gu, Daejeon District, Dong-gu, Daejeon, the network H, and 620 square meters (2,046 square meters). On April 18, 1975, the rate of reduction of 35.72% was applied to the standard cadastral records 232.2 square meters, and the size of the original right was 151 square meters (49.2 square meters and the initial right area was 150.40 square meters, but the rate of 0.6 square meters was 151 square meters during the reorganization process, but the standard cadastral records was 387.80 square meters (hereinafter referred to as the "J site"); on September 18, 1975, the rate of reduction of 37.90 percent was applied to the standard cadastral records 387.80 square meters, and each replotting was made as the land substitution.
(hereinafter referred to as “B site” and “K site before subdivision” collectively. The location of the substitute is as indicated above.
On April 25, 1979, the Plaintiff A, who purchased the K part of the right-hand map from among the land substitution sites at the time, and transferred 5.33/620 shares (the converted area is 115.58 square meters) to the head of Daejeon Dong-gu, Daejeon applied for the division of land, and the result of the division survey attached was the same as the right-hand map.
However, the land after replotting was not divided as the result of the partition survey.
However, the site before subdivision was divided according to the location and area of possession by each share holder of the right as follows. Specifically, on March 11, 1980, K large 115.9 square meters listed in attached Table 1 (hereinafter “K site”) and L large 680 square meters, and L large 680.1 square meters are divided into L large 13.2 square meters listed in attached Table 2 (hereinafter “L site”) on April 11, 1980, M large 45.7 square meters listed in attached Table 3 (hereinafter “M road”), N large 93.5 square meters listed in attached Table 4 (hereinafter “N site”), and O large 129.3 square meters listed in attached Table 5 (hereinafter “O-278”) and P-4 square meters listed in attached Table 4 (hereinafter “P site”).
Current land possessed by the Plaintiffs and Defendants are as follows:
[hereinafter] Of the J site, the part of (i) "D Possession", (b) "B possession portion", and (c) "C."