Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Facts of recognition;
A. 1) The petitioner head of the Gun: (a) the Gu Farmland Expansion and Development Promotion Act (amended by Act No. 3243, Jan. 4, 1980; hereinafter the same shall apply) shall apply in the area of farmland of 728,312 square meters in the area of 728,312 square meters in the Gu, Chungcheongbuk-gun,
(B) Pursuant to Article 9, “B development project” (hereinafter “instant development project”).
2) The instant development project included part of F, 11,952 square meters of forests and fields (hereinafter “G”) 11,952 square meters of forests and fields in Cheongju-si, Cheongju-si, which was owned by the network D (hereinafter “E Ri”).
3) Meanwhile, on November 30, 1978, F forest land before subdivision was divided into F forest land 6,436 square meters, the upper part of F forest land, the upper part of the figure surrounding the red color, from the right-hand map on November 30, 1978 (hereinafter “H forest land 4,600 square meters and 1,836 square meters of I forest land after subdivision).
) The lower part of J Forest and K Forest and 5,430 square meters (which are less than 86 square meters and less than 5,430 square meters (which are the remainder excluding J Forest and M Forest).
hereinafter referred to as “K forest”
B) The instant development project was divided into two parts. (1) As a result of the completion of the instant development project, there was a new parcel of land in the same location as “K forest” prior to replotting as in the right-hand drawing, such as ① L previous 2,622 square meters (hereinafter “L prior”), ② M previous 1,740 square meters (hereinafter “M prior”), ③ N (hereinafter “O”) in attached Table 1, 602 square meters of forest land (hereinafter “O forest”) as indicated in attached Table 1, ④ P (B) in attached Table 2, and 348 square meters of forest land (hereinafter “P”) as indicated in attached Table 2, ⑤ 58 square meters of forest land (hereinafter “R ditch”) and 6 lots of land in the same location as “S ditch” (hereinafter “S ditch”).
2) On December 15, 1979, the Do governor of Chungcheongbuk-do replaced the “K Forest” before replotting with the “L prior to replotting” and “M prior to replotting.” The Do governor authorized a replotting plan with the content that is not designated as replotting for the O forest, Q forest, R ditch, and S ditch. At that time, the Do governor announced the replotting plan under the name of the Defendant on December 12, 1984.