logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2014.12.19 2013구합21428
손실보상금
Text

1. The Defendant’s KRW 71,075,200 as well as the Plaintiff’s annual rate of KRW 5% from January 7, 2014 to November 3, 2014, and November 4, 2014.

Reasons

1. Facts of recognition;

A. The Plaintiff’s father, who was the Plaintiff’s father, around B, 1664 (hereinafter “instant land before subdivision”).

B. The land prior to the instant subdivision was each of the real estate listed in the separate sheet (hereinafter “each of the instant real estate”) through the division, land category change, etc. as listed below, and the Republic of Korea completed each registration of preservation of ownership.

On May 16, 198 (Split/land change) November 25, 198 (Subdivision/land change) On November 25, 198, 195, 1664 square meters in D forest No. 5236 square meters in D forest No. 5236 square meters in D forest No. 136 square meters in D forest No. 1663, Nov. 8, 1995 (Attachment List) B, 164 square meters in 1664 square meters in D forest No. 1363, and 404 square meters in G, 397 square meters in 1390 square meters in 5 square meters in a 1388 square meters in rivers E-road No. 258 square meters in a 1071 square meters in a 258 square meters in a 1071 square meters in a 2071 square meters in a 107

C. Meanwhile, the Plaintiff’s father, who died on June 3, 1935, succeeded to L, M, and the Plaintiff’s property (in the event of the death of a non-resident, inheritance to his/her lineal descendant in the same family register is recognized as a custom prior to the enforcement of the Civil Act), L, and M, respectively, on April 7, 1969 (the expiration of the missing period on July 28, 1958), and the Plaintiff received all the deceased’s property inheritance.

1) All land of this case is the land adjoining to the river ledger of the Han River Basic Plan prepared by the Ministry of Construction and Transportation in December 1977. According to the default on the river ledger of the Han River Basic Plan prepared by the Ministry of Construction and Transportation in December 197, the land of this case 2, 3, 4, 5, and 6 land (E or I) is registered as included in the river basin. The land of this case 2, 3, and 5 is registered in the river ledger of the Han River Basin Water Control Project prepared by the Ministry of Construction and Transportation in around 1992. The land of this case 1, 6 land is located in a place near the river basin of this case, 2, 3, and 5 land. 2) The real estate of this case is formed in the length of water between them and is used differently.

arrow