(영문) 부산지방법원서부지원 2020.12.24 2019가단105182
손해배상(산)
Text

1. The Defendant: (a) 22,963,491 won, Plaintiff B, and C respectively; and (b) 500,000 won from June 23, 2017 to December 20, 2020.

Reasons

Basic Facts

The status of the parties and the relevant plaintiff A worked as an employee in the new factory of the defendant company from January 2, 2012.

Plaintiff

B is the child of Plaintiff A, and Plaintiff C is the mother of Plaintiff A.

After the occurrence of the accident, Plaintiff A, around 14:40 on June 22, 2017, in the course of performing duties to assist the employees of the Defendant Company in the new-fashing plant, steel stude, and banding work, he left the right shoulder while moving back to the lower part of the concrete protruding structure installed on the factory floor, while moving back to the lower part of the banding work.

(B) On the other hand, Plaintiff A suffered from the instant accident, “the instant accident” (hereinafter referred to as “instant accident”), “the instant accident,” i.e., e., e., e., e., e., e., e., e., e., e., g., e., e., e., e., e., e., e., g., e., g., e., e., e., s., s.g., e., s., e., s., e., s

On July 2018, the Plaintiff was judged as class 12 or 09 of the general disability grade by the Defendant’s Intervenor.

After the Plaintiff filed the instant lawsuit against the Defendant, it was confirmed that the re-satisfing of the re-satisfing of the instant accident had been re-satisfed as a result of physical appraisal following the instant application

(B) At the time of the instant accident, the instant accident was carried out by Plaintiff A at the time of the instant accident. As such, the instant accident was carried out by two workers to put up the iron plates provided through the bareboat list in the gaps of the bareboat, while the instant accident took place, one of the workers is going back to the bareboat, so as not to display the products emitted through the bareboat, and the product was carried out in the manner of loading the products when the distribution of the products is completed.

At the time of the instant accident, Plaintiff A is an assistant worker while performing the aforementioned work.